Cleared a space in the garage to start window pan and flitch plate production. Marked up the steel for cutting the first repair sections. I have some 3.5mm galvanised plate for brackets and flitch plates.
Cleared a space in the garage to start window pan and flitch plate production. Marked up the steel for cutting the first repair sections. I have some 3.5mm galvanised plate for brackets and flitch plates.
Prepared rear shock absorbers for fitting. Filled with new SAE20 shock oil and refitted lever arm to repaired shock absorber. Bolts arrived today so fitting is imminent.
Removed rearmost nearside window pan today.