24/7/2019

Stripped and prepared the panel that fits below the large window in the bulkhead in front of the entrance vestibule.  This, and the window, needs to be refitted before the outer cladding of the pillar can be fitted.  There was minor corrosion of this panel along the lower edges where it abutted various steel components.  All the edges of the panel have been treated with waxoyl to slow down further corrosion.  The panel is otherwise undamaged so good to be reused.

23/7/2019

Primed the steel part of the front bulkhead today, including the small window frame.

Stripped the paint off the cladding panel for the forward entrance pillar, ready to trial fit tomorrow.

Bulkhead showing small window

Bulkhead showing small window

Closeup of lower bulkhead showing that the repair is invisible.

Closeup of lower bulkhead showing that the repair is invisible.

 

22/7/2019

Continued working on the front bulkhead today, removing paint from the small window frame and elsewhere.  There is some slight corrosion evident on the frame, as it is only minor I treated it with a bit of Jenolite to loosen it up and will remove it tomorrow.

I managed to get some brown gloss paint to match floor made up at Ridgeons.

Applied second coat of gloss black to the lower step finisher.