More welding of window frames. One frame is ready to have the top horizontal welded on and hopefully a second will be in that position tomorrow.
Monthly Archives: January 2020
4/1/2020
Today I completed the metal work for the upper horizontals for the last three window frames. All the parts are present now ready to be welded together.
3/1/2020
Finished folding the side verticals for the windows, only the top horizontals left to form now. The rest of the day was spent tidying up the folds with a panel beating hammer to get crisp bend lines. Had a visit from another Jonnie Brenson and his Dad but still managed to do most of the pieces, only two lower horizontals remain to be done tomorrow.