At the start of the week I had completed assembly of the wiring cover behind the front O/S wheelarch and was fettling it to fit around the griplock and other wiring. This necessitated some small alterations to the existing location of P-Clips and griplock runs and the relocation of the terminal strip for the multicore cable.