Started the week by working on the MW nearside rear axle, removing the wheels, hub cover and half-shaft with a view to replacing the oilseals to stop the oil leak. Damage to the sealing surface was immedaitely apparent. Whilst awaiting assistance from Ian to remove the hub nut, I worked on the Regal’s cab window, preparing the fixed glass for assembly into the frame, at which point I realised I needed to paint the insides of the frame before I put the glass in. Having done that, I continued taping up the edges of the glass for the fixed pane. I took the template for the front mudwing to Geoff brown and had a long discussion with him about assembling the parts.