Not much to report this week. Almost all work has been focused on making parts for the half-drop window frames. So far, I have made one complete frame, two lower horizontals, one upper horizontal and a full set of verticals for the nearside. This afternoon I spent the last hour bending channel section for the lower corners, eight in total (two per window) from scrap left over from making the straight parts. I have enough steel in stock to make the offside windows too.