The previous couple of days were spent in much-needed tidying of the bus shed and installation of two large cupboards at the end furthest from the big doors. This has enabled me to store all the paint safely and get a lot of other stuff off the floor.
Today I was able to assemble the steel reinforcement plates to the body frame behind the NSR wheelarch and the boot. One plate remains to be fitted, this being the one behind the boot front closing plate which will need to be drilled and fitted before this plate can be bolted up.
I ordered the floor covering for the boot and luggage racks today.