Continued to work on the boot lower frame rail, cutting out for the side rod joints. As with the NS frame rail it takes a lot of trial fitting before it lines up with everything, but it was very close by the end of the afternoon today.
Continued to work on the boot lower frame rail, cutting out for the side rod joints. As with the NS frame rail it takes a lot of trial fitting before it lines up with everything, but it was very close by the end of the afternoon today.