5/11/2023

First job of the week was to apply two coats of Zinc Phosphate red oxide to the offside chassis rail inner face. The terminal box and griplock gland for the multicore cable has been mounted in the boot.  The chassis rail inner face has been silvered and the the griplock conduit, complete with multicore cable run from the cab to the boot stress panel along the inner face of the O/S chassis frame rail.  I am waiting on delivery of the correct size of P-clips to secure the conduit.  I started to  fabricate the cover for the wiring behind the front O/S wing as a fill-in job until I can secure the front-to-rear conduit.  I managed to make the side piece and top pieces and mark out the final piece ready for cutting on Monday.

Terminal box mounted in the boot. Multicore tagstrip in the foreground.