11/8/24

Surprisingly, the ED handle was ready on Monday, a very quick turnaround and cheap too, at £40!  Work continues on the ED window frame, firstly correcting the dimensions of the outer frame top horizontal, which sets the rest of the outer frame’s dimensions.  Next was to cut,  fold and weld on the sides and the bottom outer pieces.  By the end of the week I had finished the entire frame ready for cosmetic filling and had a pplied a preliminary coat of red oxide to the rear ready for sealing the welds.