18/8/2024

First job of the week was to apply cosmetic filler to the weld on the emergency door window frame then rub this down and prime the whole frame, sealing the weld and paint the rear grey.  The weather has been very hot this week so the number of hours worked was reduced, though it got cooler as the week went on I still felt progress was slow.  Having completed the window frame cosmetically to my satisfaction I continued working on the wood frame of the emergency door, removing the remains of the corrosion left by the panels and removing the felt panel insulator.  I removed the two rubber guide bases to use as templates for new rubbers and started to remove the hinges for repainting, marking the middle one with an M.  Work ended there due to the need to prepare the MW for a trip to Lodges on Sunday 18th of August.