23/10/2018

Finished removing the rain deflector from above the nearside windows.  Removed the second window, this will require some more complex fabrication than the first but looks repairable.

Reconstruction is becoming clearer now – waist rail panels first, then windows and finally lower panels when the frame has been repaired.

One thought on “23/10/2018”

Comments are closed.