The previous two days I spent making the ash repair section for the entrance pillar. This is completed and fitted as shown in the picture:
Other work done includes plugging more screw holes with hardwood dowels and sanding these off flush. Work is now concentrated at the top of the pillar where there is a steel plate and bracket under which the pillar has rotted. This requires the removal of the drip rail above the entrance and the wired-edge panel that finishes the top of the entrance, which is extensively corroded as can be seen in this picture:
14/12/2019 – I still haven’t made a new fairing for above the entrance, despite having the material for a year!
Picture of new panel added 7/4/2021