New stock of dowels arrived in the post yesterday so today I spent making sure I had filled everything that needed to be filled before frame painting can commence. I probably need to do a final look over tomorrow. Removed the detachable section of below-the-floor side rod so as to have a pattern for replacements. Four per side seem to be required.
One thought on “31/1/2019”
Comments are closed.
The carpenter turned out to be me and new side rod extensions were made on my bandsaw and finished on my band sander. It turned out to easier than I thought it would be.