31/1/2019

New stock of dowels arrived in the post yesterday so today I spent making sure I had filled everything that needed to be filled before frame painting can commence.  I probably need to do a final look over tomorrow.  Removed the detachable section of below-the-floor side rod so as to have a pattern for replacements.  Four per side seem to be required.

One thought on “31/1/2019”

  1. The carpenter turned out to be me and new side rod extensions were made on my bandsaw and finished on my band sander. It turned out to easier than I thought it would be.

Comments are closed.