16/5/2019

Prepared angle iron entrance step frame for painting.   Applied epoxy filler to top surface of top step frame to fill pits left after blasting away the rust.    Applied first coat of red oxide.

Did some filling and sanding on the front  bulkhead repair, need to make sure this is all ready for spraying with red oxide when I do the stair enclosure and the chassis.