Yesterday and today I have been manufacturing a new timber corner section for the rear RH corner. This is a slow process as it consists of a number of pieces of wood that need to be glued together initially before machining to the correct shape. Hopefully the final piece will be in place tomorrow then I can complete installation the day after. I will probably put a steel reinforcing plate underneath just to make sure it all stays together.
Tag Archives: body frame
27/3/2020
First job today was to make an infill piece to the left of the RH boot door hinge pillar. Next, I intended to repair the RH corner perimeter rail. This didn’t look to bad on first glance but once I started poking it I discovered extensive rot in the rail and the filler piece that supports the boot floor. This was all removed and I started to make up the first section needed to rebuild the corner. The pictures below shows what is missing, after and before.
26/3/2020
Still haven’t fitted the wood screws through the reinforcing plates on the outer pillar, must do that tomorrow!
I fitted up the inner pillar today, this really took all day as I had to make several trial fittings with the boot doors in place, This necessitated drilling the hinge mounting holes clear for 2BA temporary screws, then rehanging the doors. Hopefully a good fit will be the final result.
I made up a couple of blocks of Iroko as distance pieces and to repair a missing piece of the perimeter rail before screwing and gluing the pillar into place. I need to make up another distance piece tomorrow but otherwise the next step is to make the small pieces of wood that the door abuts on the pillar.