1/1/2022 – Year summary for 2021

The last two weeks have seen the completion of repairs to the O/S frame, the last of the rusty screws and nails removed and the holes dowelled.   The last of the new flitch plated have been fitted.   The repairs to the cantrail have been sanded level and the rest of the frame sanded and prepared for painting.  The unpainted woodwork has been primed and the a start made on painting the whole of the exposed frame with grey top coat.

As it is the first day of the year, a summary of work completed in the last twelve months is appropriate.

The nearside of the bus from the entrance rearwards has been structurally completed, all windows panels are in place and beaded.  The rear corner panel has been cosmetically filled and finished in undercoat.  A new mudwing and liner was fabricated and installed and the wheelbox cover stripped, painted and refitted with new mountings.

The roof has been completely stripped of all paint and repaired where necessary to make it watertight.

The roof over the entrance and nearside front wheel has been repaired and is ready for cosmetic finishing, including a new valance over the entrance steps.

A new rear number plate box was fabricated and installed, along with new bulb holders and wiring for the stop and tail lights. The boot doors have been refitted and primed.

The destination box glass has been removed and a replacement obtained.  Some repairs have been made to the wooden frame that supports the glass.

The entrance step light was repaired and repainted ready for fitting.

The boot was finished internally with new lino.

Work has now commenced on the offside with all windows removed, frame repairs completed above the floor and the frame partially painted.

 

 

 

5/1/2021

The final piece of glass for the nearside turned out to have been cut incorrectly so I was very annoyed not to be able to complete the installation of the windows.  This means I cannot carry on as planned, so in the meantime my attention has turned to repairing the roof over the entrance.  The first two sections have been riveted in, the last piece should go in tomorrow then I will make the decorative arch fairing that goes over the door and under the roof cladding.

30/12/2020

Today I finished machining and polishing the replacement bezel for the entrance door handle.  This will be sent off for chroming at some point along with all the other door furniture.

Other work completed since the last entry:   the third droplight was  installed, then the  fourth droplight was assembled and installed and finally the plain square window (opposite the emergency door) has been reglazed using the rubber supplied by AM Silicones.   This leaves just the rounded window at the rear to be assembled and fitted then the nearside will be ready for beading.   All the steel window frames are painted and then treated with waxoyl on the inside before installation; the plain square window has been treated and should be ready for installation tomorrow when the waxoyl has set.