The last few days were spent painting the interior of the boot the correct shade of ochre brown and preparing the boot door frames for reskinning. This included making and painting the new steel parts for the L/H boot door. Today I fitted the metalwork to the R/H boot door and the top corner plate to the L/H door then rehung them to allow me to line up the bottom edge steel strips.
Tag Archives: boot doors
13/7/2020
The last week has been spent continuing to prepare the boot interior for painting and also preparing, priming and painting the new timber around the the base of the rear window. The interior upper corner panels around the rear seat, the timber around the rear window and the lower panels in the boot where they are above the seat platform were undercoated then given two coats of Tahiti blue. The undercoat I created from dark grey undercoat mixed with some generic mid-blue coach enamel, however it came out a bit dark so I think I’ll mix in some white undercoat next time. I also started work on the left-hand boot door, removing the skin, filling holes with dowel and replacing wood where necessary. This is now ready for primer. The right-hand door needs a little more attention to holes but is otherwise ready for skinning once the metalwork has been reattached.
1/7/2020
The last two days have been spend making the steel sill cover, which is now complete and the underneath surface primed, and adjusting the fit of the left-hand boot door. I have now removed the outer skin of this and marked up where the catch should be in the boot floor. There is still some work to do replacing the screws to the door frame in the centre hinge and relieving the aperture frame a bit more around the top left-hand curved corner.