Primed the repair section for the forward door pillar.
Drilled the mounting holes in the mahogany planks for the steps. I also drilled some packing strips for underneath the planks. Soaked the whole lot in preservative.
Oxided the floor plate for the entrance this morning. The rest of the day was spent cutting and sanding floor boards to shape for the entrance area. These should be drilled and finished tomorrow ready for a dip in preservative.