Tag Archives: wheelarch

18/1/2020

Spent today sanding and fitting up the three pieces of timber that make up the forward lower section of the wheelarch.   I just about completed these by finishing time.

17/1/2020

Finished checking and adjusting the window frames today.   Only two needed adjustment, thankfully.

After that I started work on the wheelarch framing, removing the lower forward section and used it to mark up cut out a new piece of timber.

19/9/2018

First coat of black on drive hubs.  Red oxide applied to nearside rear hub.  Vactan applied to offside rear hub after wirebrushing and degreasing.

Cleaned and stripped remaining enamel from AEC hub badges.  Primed and sprayed silver (rims left in chrome) ready for blue and red infill.

Started to remove panelling above offside rear wheel aperture, most screws just pull out as the frame is totally rotten.  Bulges in the body work discovered to be caused by heavily corroded steel flitch plates at frame joints.  This sequence of photos shows how the rubber infill is fitted above the mudguard and how the curve at the bottom of the bodywork is achieved.

20180919_162807  towards the front

20180919_162754  towards the rear

20180919_162726  The flat edge of the rubber is against the panel (half round beading fitted over) and the lip abuts the mudguard.

20180919_162404 shaped blocks are used at the bottom of the verticals.