The speedometer cable has been finished and tested and the speedo has been installed in the dash. Also installed is a brand-new vacuum gauge. The pipe from the exhauster to the autovac gave some trouble with the steel nipple at the exhauster end not soldering well to the steel pipe, so I replace it with a brass nipple. Hopefully this will be a better joint. The pipe has been fitted at the exhauster end but not yet to the autovac to give time for the soldered nipple joint to reach full strength. Work in the cab has continued with the refurbing of some of the fittings, the horn button and panel light switch in particular. Both have now been installed and wired up. I chose not to bring the conduit for this wiring into the cab but ran it through sheathing from the conduit which is now fitted flush with the cab side wall. The bracket for the indicator switch has been installed and the 5-core cable for the switch has been ordered. The wiring cover for the cab rear wall has been painted and refitted, not without some difficulty. The wooden bases for the panel light switch and tax/cof discs have been painted and the metal brackets to hold them recovered from the original disc holders, derusted and painted silver ready for refitting. The cab floor forward panel has had the budget lock fitted and material for draught seals has arrived.