Monday’s planned task was to prime some of the O/S panelwork, principally to allow fitment of the kick panel by the cab door. This has been cut and fettled to fit the ironwork surround for the step. The ironwork itself needed straightening and removal of much rust, including grinding down the original welds which must have prevented it from ever fitting flush against the kick panel. The picture at the bottom of the page shows how it was with the ironwork poorly fitted and with an incorrect cut-out for the step. Although I chose a good piece of metal for the kick panel, I found it had a lot of small marks so I had to rub it down and spray it with smooth Hammerite silver. I could not face making another so it will have to do. Had a problem with the panel in front of the tank bowing outwards, released the screws along the bottom and halfway up the forward edge, warmed it a bit then pushed it back into place. I put another screw in just below the tank filler where it wil be hidden by the splash plate. Seems ok. I started to fit the bezel to the hole for viewing the fuel gauge, heated it up and bent it a bit too far. Unfortunately I managed to crack it in two places whilst getting it right but it seems to be holding together and fits well enough now, so I fitted it using a bit of seam sealer, hoping it will stick together and be ok. It does look ok. I sprayed the the ironwork for the step with No. 1 rustbeater and then engine lacquer black. It needs a couple more coats but is looking nicer already. The final job before Christmas was to make the splash panel for the tank filler, cutting it to fit around the duct end that I am using to trim the hole and stiffen the whole side panel. On Christmas day I updated 2023’s plan and created a new one from it for 2024. I hope to have the bus substantially complete by this time next year.