Tag Archives: summary

31/12/2020 – Summary for 2020

Today I installed the plain window, last but one towards the rear of the bus.  I started to assemble the last window, cut the rubber to size and drilled the frame only to discover the glass had been cut incorrectly, so I will not be able to complete the nearside windows this year.

As it is the end of the year, a summary of work completed in the last twelve months is appropriate.

Looking back, the work completed this year comprises:

Droplight window frames, full set of 8 completed, four assembled, several with new glass, and fitted to nearside along with one plain window opposite the emergency exit.

Entrance steps finished.

Rear window removed, frame repaired and window refitted with new seal.

Corner panels removed, stripped, reshaped and repaired then refitted.

Boot rebuilt, including the steel stress panel that closes off the front, framing around the door opening, the boot inner walls and I reskinned the boot doors.

Nearside cladding panels installed below the windows.

 

 

31/12/2019 and 2019 summary

Today was spent cutting the box section stock for the remaining window frames. This is almost complete and just requires cutting to length.

As it is the end of the year, a summary of work completed in the last twelve months is appropriate. 2019 has been the year of bodywork.

Starting at the front, the main steel bulkhead has has been fully repaired and painted.

New steel has been grafted into the roof structure above the entrance.

The complex shaped aluminium fairing immediately in front of the entrance was repaired by welding and refitted.

The entrance steps have been completely replaced with new steel and new mahogany treads. The floor around the entrance has been replaced.

The nearside chassis member outside face has been silvered from the rear wheels forward to the engine bay.

The nearside main body frame has been repaired, new steel flitch plates made and fitted and painted from the front rearwards to the rear wheel opening.

Two fixed-light window frames have been rebuilt and are awaiting glass. Five droplight frames have been manufactured and the remaining three are in progress.

The first bay rearwards from the entrance has been completed with new panels and the first half drop window completed and installed.

The plan for 2020 is to complete the nearside, rebuild the rear end and boot and progress to the offside starting with the emergency door.